Advice

What is meant by P mark in a meter status in an electricity bill?

What is meant by P mark in a meter status in an electricity bill?

Consumption under temporary connection. 15 p/unit. Consumption of self-generated energy of any purpose.

How do I correct my RDF bill?

RDF-reading defective That is, unit consumption = 50-100 = -50 unit means negative consumption. so the bill is framed on an RDF base. Its correction is corrected by the electricity department by amending the bill.

What is minimum charges in electricity bill in Uppcl?

They pay ₹ 5.5 for the first 150 units or in between 0-150 units if the unite consumption is more than 151 to 300 means, they shall pay ₹ 6 per unit. For unit 301 to 500, the consumer has to pay ₹ 6.5 per unit. For above 500 units, the UPPCL per unit tariff will be ₹ 7.

READ ALSO:   How long does it take to lose 40 kgs?

What is RDF in Uppcl?

RDF (Reading Defective) : This is an auto-generated meter read remark if the billing system finds that previous read is higher than the current read.

What is recorded MD in bescom?

Maximum demand term or Maximum demand indicator (MDI) This is the maximum power value, usually the average of 15 minutes, reached during the billing period (this average time may vary depending on the country). Once the value is higher than the contracted power, the customer will pay a penalty on the electricity bill.

What is RDF in Semantic Web?

Resource Description Framework (RDF) RDF is a standard model for data interchange on the Web. RDF has features that facilitate data merging even if the underlying schemas differ, and it specifically supports the evolution of schemas over time without requiring all the data consumers to be changed.

How do you read current?

By measuring the voltage across the resistor the current can easily be calculated. For example of a 10Ω resistor is placed in circuit and a reading of 100 mV is detected across it, then using Ohms Law it can be deduced that the current is V / R = 0.1 / 10 = 10 mA .