How is NCR calculated in cement industry?
Table of Contents
How is NCR calculated in cement industry?
- INVOICE/Bill.
- Less all DISCOUNTS (Rate Dis/ Cash Dis/Quantity Lifting Dis etc..)
- comes your Net Of Discount.
- Less all TAXES (Excise & VAT)
- comes Net Selling Price.
- Less Total Depreciation Cost (PRIMARY or SECONDARY FREIGHT /PRIMARY or SECNODRY HANDLING/BAG COST.
- Comes your NCR.
What is NSR in cement industry?
Broking expects Ambuja’s standalone net sales to increase 5.8 per cent YoY in Q1CY17 led by 6 per cent higher net sales realisation(NSR) YoY amid flat volume growth on YoY basis. On sequential basis YoY, volumes were up 15 per cent.
Where does Portland cement come from?
portland cement, binding material in the form of a finely ground powder, usually gray, that is manufactured by burning and grinding a mixture of limestone and clay or limestone and shale.
How do you calculate sales Realisation?
Realization \% is calculated by taking the Total Billed Hours (or hours billed to customers) divided by the Total Billable Hours. The result defines what percentage of time the resource is working to bring revenue into the business.
What is cement Realisation?
Price Realisation = Sales Value (in amount) / Quantity sold (in units) Example. Say for a quarter, Company A reported sales of Rs. 2,555.90 crore and cement sales of 5.4 million tonnes i.e. 54 lakh tonnes.
How do you calculate Portland cement?
MIXING: MIXING INSTRUCTIONS Use the following mix proportions to make general purpose concrete: Mix together • 1 part cement (This bag contains 94 lbs. or 1 cu. ft.). 2 parts concrete sand or general purpose sand (160-180 lbs.). 3 parts gravel or stone (240-300 lbs., 3⁄4” recommended).
What is a good realization rate?
What is a good collection realization rate? The goal for your firm wide collection realization should be 90\% or higher.
How do you calculate Realisation?
Realization \% is calculated by taking the Total Billed Hours (or hours billed to customers) divided by the Total Billable Hours. The result defines what percentage of time the resource is working to bring revenue into the business. Example: Of 1920 hours worked, 1800 were billable hours.
How do you calculate price Realisation?
Price realisation is the average selling price per unit of the product / commodity for the business. It is useful in computing sales realisation over different periods and different geographies for the same business and different businesses in the same sector.
What is the ratio for Portland cement?
Normal ratio is 1 part cement, 2 parts sand, and 3 parts gravel (trade the word part for shovel, bucket, or any other measuring device). # Begin adding water to the mixture slowly, mixing continuously until it becomes plastic enough to place in your form.