What is ramp-up in software development?
Table of Contents
What is ramp-up in software development?
When a software developer joins an ongoing software project, the team is faced with the ramp-up problem, a term coined by Brooks [4] that describes the period of time required by new developers to familiarize themselves with their new environment before they can make useful contributions to the project.
What does ramp-up a project mean?
Ramp up is a term used in economics and business to describe an increase in firm production ahead of. anticipated increases in product demand [2] There are various project management models that are typically discussed in the IT world.
How do you ramp-up a software engineer?
Following points should make one quickly ramp up his learning in a new software project and get productive:
- Understand the business use case. What problem your product solves? Learn the big picture before you touch the source code.
- Know the end to end flow. How build is done?
- Set up a dev and test environment yoursel.
How long does it take an engineer to ramp-up?
In most of the companies we surveyed, engineers and managers reported it takes 3 to 9 months to be fully ramped-up. There is also a significant percentage of companies where it takes a full year. Imagine what that means for a company where most engineers leave after approximately 2 years.
What is a ramp up meeting?
Ramp-up is a term used in economics and business to describe an increase in a firm’s production ahead of anticipated increases in product demand. In the consumer electronics industry, manufacturers often ramp-up production in the early fall to meet demand during the holiday selling season.
What is another word for ramp up?
What is another word for ramp up?
advance | increase |
---|---|
addition | enlargement |
extension | intensification |
run-up | step up |
ascension | rising |
What is another word for ramp-up?
What is ramp-up in performance testing?
Ramp-up is the amount of time it will take Apache JMeter™ to add all test users (threads) to test execution — or in other words, how long it will take to JMeter to start execution of all the threads. For example: 1,000 target threads with 1,000 seconds ramp-up: JMeter will add one user each second.
How do you read Codebase?
Read, Read, Read The fact is simple: to understand what the code in your codebase is doing, you are going to have to read it. Read everything — unit tests, documentation, and the code itself. Read it slowly, line by line, and figure out what it’s doing. Read as much of it as you can, as often as you can.
What should be included in a ramp-up?
Parameters to consider when deciding upon a certain ramp-up strategy are utilization, product variety, ramp- up time and decoupling level. In this context the decoupling level concerns whether the pilot production of the product or products are performed on a separate or existing line.
What does ramp down mean?
to decrease or cause to decrease. (intr) to decrease the effort involved in a process.