Blog

How do I create a test plan in Jira?

How do I create a test plan in Jira?

Test Plans panel

  1. Go to Jira Administration > Add-ons (or Apps) > TestFLO > Panel Filter Result and click Add Panel.
  2. Set Panel title: Test Plans.
  3. Select Project: the project with Master Test Plan issue type.
  4. Set Issue Type: Master Test Plan.
  5. Set JQL: issuetype = “Test Plan”

What is a test plan in Zephyr?

Zephyr uses the Cycle Summary to plan the test cycle. Once cycles are planned, the test team can add and remove test cases from the cycles as needed. Test cases are validated for the content and, details, and assigned to the teams for peer review.

READ ALSO:   What goal of the MDGs was about health?

How do you create a test execution in Zephyr?

In Zephyr’s left tool dock, click Test Execution. In the Test Execution tree, select the folder containing the test cases to be executed. In the list view of test cases, select the check boxes corresponding to the desired test cases. Next, click the button next to Execution.

How do I run a test case in Jira Zephyr?

You can execute the overall test case by updating and changing the status within the “Execution Status” section by simply clicking on the status drop-down list and choosing a status from the following: Pass, Fail, WIP (Work in Progress), and Blocked.

How do I create a test report in Jira?

Test Execution Report

  1. Click on Projects in main bar in Jira and select project from list.
  2. Click on Test Reports on left side menu.
  3. Choose the Test Execution Report.

How do I create a folder in Zephyr?

To create a Folder, select an existing Test Cycle’s contextual menu and then select Add Folder.

  1. The user will be prompted to enter a name before the Folder is created.
  2. Once the new Folder is created, you can now use the contextual menu to Add Tests, Edit the Folder information, Clone, Delete, or Export the Folder.
READ ALSO:   Is infinity countable or uncountable?

What is test plan and test case?

A test plan is a comprehensive document that lays out all major activities associated with a particular testing project. Conversely, a test case is only designed to test a particular scenario A testing plan should include: Scope of the project. Goals and objectives.

How do I create a test execution dashboard in Jira?

How do you create and execute a test case in Jira?

Quick Tips for Writing Test Cases in Jira

  1. Create a “Test Case” Issue — and Keep It Open. But Jira issues are meant to be pushed to done.
  2. Tweak a User Story to Be a Test Case.
  3. Add a “Testing” Status to Your Jira Workflow.
  4. Automate Your Testing Processes.
  5. Integrate Your Tools.
  6. Use Traceability.

How do I create a test script in Jira?

How do I create a test folder in Jira?

To create a test folder:

  1. Select Team from the left menu bar.
  2. Under the Quality section of the menu bar, select Test Folders; the Test Folders page displays.
  3. On the toolbar (top-right of the page), click the Add Test Folder button.
  4. Type the name of the test folder.