What time is the last MRT today?
Table of Contents
What time is the last MRT today?
First/Last train service terminating at NS1 EW24 Jurong East
First Train | Last Train | |
---|---|---|
Monday – Thursday | 05:35 | 00:37 |
Friday | 05:35 | 00:37 |
Saturday | 05:35 | 00:37 |
Sunday | 05:58 | 00:37 |
What time is the last bus from Changi Airport?
24 | CHANGI AIRPORT (LOOP) | |
---|---|---|
First Bus | Last Bus | |
Weekdays | 06:05 | 00:08 |
Saturdays | 06:04 | 00:05 |
Sundays & Public Holidays | 06:03 | 00:05 |
What time MRT start operating?
5.30am to around midnight
Train Operation Hours and Frequency 5.30am to around midnight daily. Operating hours are usually extended during festive periods. You may check the SMRT and SBS Transit websites for changes in operating hours, or download the MyTransport app (iOS | Android).
What time is the last train for downtown line?
Downtown Line – (DT17) Downtown | ||
---|---|---|
Destination | First Train | Last Train |
Weekdays & Sat | Daily | |
DT1 Bukit Panjang | 6:13am | 12:16am |
DT35 Expo | 6:04am | 12:06am |
Is Joo Koon MRT open?
Joo Koon MRT station at night….EW29.
EW29 Joo Koon 裕群 ஜூ கூன் Joo Koon | |
---|---|
Opened | 28 February 2009 |
Electrified | Yes |
Services | |
Preceding station Mass Rapid Transit Following station Pioneer towards Pasir Ris East West Line Gul Circle towards Tuas Link East West Line Terminating trains Terminus |
Is Boon Lay MRT closed?
Closure of the Boon Lay—Tuas Link section will take place from mid-March to April 2021, and closure of the shorter Joo Koon—Tuas Link section will take place from April to May 2021.
How do I get out of Jewel to MRT?
By Train. Take the Mass Rapid Transport (MRT) to the Changi Airport Station (CG2). Upon exiting the station (CG2), Jewel is accessible via link bridges located at level 2 of Terminals 2 and 3. Take a train to the Tanah Merah (EW4) station and cross the platform to transfer to an Airport-bound train.
How fast does MRT travel?
Mass Rapid Transit (Singapore)
Overview | |
---|---|
Minimum radius of curvature | 400–500 m (1,312.34–1,640.42 ft) (mainline), 190 m (623.36 ft) (depot) |
Electrification | 750 V DC third rail 1,500 V DC overhead catenary |
Top speed | 78–90 km/h (48–56 mph) (service) 90–100 km/h (56–62 mph) (design) |
hideMRT network map |