General

Is Mivan technology better?

Is Mivan technology better?

Mivan system is much faster than the traditional beam, column, brick construction. Thus, in the debate Mivan construction vs brick construction, Mivan comes out on top as being faster.

What is Mivan technology all about?

Mivan shuttering is a fast-paced construction technique which offers strength and durability to a building by use of aluminium formworks. With a growing focus on affordable homes and “Housing for All”, real estate stakeholders are increasingly emphasising on the use of new and innovative construction techniques.

Is Mivan technology expensive?

In case of the superstructure, Mivan construction method incurs Rs 10 crore for structuring the building. However, the traditional method would cost around Rs 7 crore. As mentioned above, Mivan technology has an edge over conventional formwork in terms of the construction cycle.

READ ALSO:   Are muscles attached to your skin?

What is the life of Mivan construction?

Mivan construction versus conventional formwork

Parameter Mivan system Regular formwork
Speed of development 7 days/floor Minimum 21 days/floor
Quality of surface finish Excellent Putting is required
Pre-planning of formwork system Required Not required
Type of construction Cast-in-situ cellular construction Simple RCC

Is mivan construction safe?

Seismic Resistant & Durable – The buildings are more seismic resistant and more durable. Earthquake Resistant – More earthquake resistant structure and safer in case of a strong earthquake. This is because structures built using Mivan is a monolithic concrete structure which acts as a whole single strong unit.

What are the advantages of Mivan shuttering?

Advantages and Disadvantages of MIVAN Construction Technology

Advantages Disadvantages
Smooth & Premium Finish Finishing Lines will be visible
Highly Durable & Earthquake Resistant No room for alterations or modifications
Low Maintenance Prone to visible cracks which can be avoided if precautions are used

Is mivan better than RCC?

Mivan technology fits into this requirement of mass housing and serves the purpose pretty well. Mivan is an Aluminium formwork technology where the whole structure is of RCC ( Reinforced Cement concrete ) and brick walls are not used. Mivan system is much faster than the traditional beam,column,brick construction.

READ ALSO:   Who fought in the French Revolution?

Who invented Mivan technology?

MIVAN technology can be basically stated as an as aluminum formwork system, which has been developed by one of the eminent construction companies from Europe. During the 1990s, such formwork was used by the Mivan Company Ltd from Malaysia (where a large number of multistory buildings are constructed.

Can we break walls in mivan construction?

As such, the building structure is monolithic and highly stable. However, this means that both the walls and columns are load-bearing and therefore, one cannot demolish a wall without assessing its consequences.

What are the advantages and disadvantages of Mivan technology?

Mivan formwork is very lightweight and quite easy to carry. Comparatively lower resistant to seismic forces. Structures formed by using mivan formwork are comparatively more resistant to seismic forces. Miscellaneous problems such as leakage and moisture absorption.

Is mivan construction earthquake resistant?

Construction with Mivan technology involves thinner walls, which accommodates higher carpet areas. Buildings constructed using Mivan shuttering tend to withstand earthquakes better than traditional buildings.

READ ALSO:   What is an access point for internet?

Can we drill in mivan wall?

Since most of the buildings have very minimal chances of structural or architectural change when developed in MIVAN construction, you cannot drill or nail the wall to hand pictures, renovate or revamp the house.