Explanation: A correct order of the waterfall model phases are problem identification, analysis, design, implementation, testing, deployment, and implementation.

What are the 6 stages of waterfall method?

The waterfall model has six stages: requirements, analysis, design, coding, testing, and deployment. During the requirements stage, developers write down all the possible requirements of a system in a requirements document.

How many steps are in the waterfall model?

The Phases of Waterfall Methodology The Waterfall methodology is broken into seven stages, and each stage is completely dependent on the previous ones.

READ ALSO:   How long does it take from e2 to e3 in the Marines?

What are waterfall steps?

The Waterfall methodology—also known as the Waterfall Model—is a sequential software development process, where progress flows steadily toward the conclusion (like a waterfall) through the phases of a project (that is, analysis, design, development, testing).

What is correct software process cycle Mcq?

Answer: plan , do , check,act is the correct form of software process cycle.

Which of the following option is the correct order of SDLC?

Requirement Analysis, Design, Coding, Testing.

What is waterfall model with diagram?

In a waterfall model, each phase must be completed before the next phase can begin and there is no overlapping in the phases. The Waterfall model is the earliest SDLC approach that was used for software development. The waterfall Model illustrates the software development process in a linear sequential flow.

What is correct steps of software process cycle?

It’s typically divided into six to eight steps: Planning, Requirements, Design, Build, Document, Test, Deploy, Maintain. Some project managers will combine, split, or omit steps, depending on the project’s scope. These are the core components recommended for all software development projects.

READ ALSO:   Can we have main door in North-East?

What is the correct software process?

Which of the following is the correct sequence of the software process?

Known as the ‘software development life cycle,’ these six steps include planning, analysis, design, development & implementation, testing & deployment and maintenance.